Specialty concrete
SUNSHINE LAND DESIGN
Fort Pierce Inlet Jetty Repair Located at the Fort Pierce inlet jetty, we were called upon to pour concrete for sea erosion repairs. Requiring special placement in a tight and remote location. Our front discharge trucks and well trained delivery professionals handled this pour with ease. A project of this type was not the first of this application for Maschmeyer. We have made such repairs to Seawalls and Jetty's at other site projects. We have even delivered through the use of barges. WELLINGTON EQUESTRIAN DEVELOPMENT
Palm Beach International Equestrian Center is one of the world's most prestigious equestrian facilities. We were proud to be a part of their multimillion dollar renovation project. Some of the renovations to the facility included new box and stadium seating, construction of new walkways, bridge repairs concession buildings and a restaurant. While the arenas were under construction it required us to pour on a tight schedule and called upon our front discharge trucks and delivery professionals to maneuver in tight off roads areas. |
FLORIDA GAS
Indian Head Pipeline Services Over 12,000 yards of Pipeline weights and coated Pipe for the Florida Gas Natural Gas Pipeline feed to Florida Power and Light facility. RW HARRIS, INC.
Specializing in drill shaft, caisson foundations for the use on towers and building foundations. Our relationship with RW Harris over the years has allowed us to participate in manner tower foundation applications in the South East Florida region. These applications require specialty mix designs along with a large truck demand for a continuous pour. We easily meet the challenge when called upon even in the most remote areas. |